YEAR EVENTS
1993 - The Company achieved all the targets set under the Memorandum
Understanding (MOU) signed with the Government of India for the 5
successive year.
- Korba - the first biggest power station of the Country situated
in Bilaspur district of M. P.
- Unit-I was synchronised in March, 1992.
- Due to the disturbed conditions in Russia the supply of balance
parts for the other units had been very adversely affected. As a
result, despite best efforts, the second unit could not be
commissioned in 1992-93 and it will now be commissioned in
1993-94.
- Unit-I was commissioned during 1991-92. Two more units were
added during 1992-93. These units are under stabilisation.
- The construction work on fourth unit was
substantially affected due to non-performance of some of the
contractors and the Unit is now envisaged to be commissioned
during early 1994-95.
- The first gas turbine was synchronised in
1991-92, the remaining three gas turbines and two (2) steam
turbines were commissioned in the financial year 1992-93.
- Generation at NTPC's coal and gas based power stations was
affected severely due to coal and gas shortages and also due to
grid restrictions.
- Karnataka Government has entered into an understanding with
M/s. Cogentrix, USA for establishing Mangalore TPP.
- NTPC has always been the trail blazer in
acquiring/assimilating and developing the latest
state-of-the-art technologies for ensuring high level of
operational performance of its plants in terms of availability,
reliability, efficiency and pollution control.
- NTPC has been recognised as the first
utility to build in-house Company by bodies like BIS, SEI and
the industry.
- During the year, NTPC initiated studies
like ecological impact assessment through satellite imageries,
detailed geohydrological studies around ash pond of various
projects.
- An agreement was signed with M/s. Ballarpur
Industries Ltd. (BILT) for supply of dryfly ash at the rate of
about 250T per day from Badarpur Thermal Power Plant for the
manufacture of aerated autoclaved concrete products.
- NTPC has entered the era of ON-line Information environment
through INGRESS RDBMS.
- NTPC has made its successful way into exciting Hi-tech
field of MULTIMEDIA by installing first Multimedia Workstation.
- A new company, "Spectrum Power Generation Ltd." Jointly
promoted by Spectrum Technologies, USA, Jaya Food Industries,
Hyderabad and NTPC, to implement the project has been formed.
- The Power Purchase Agreement, Promoters'
Agreement and Fuel Supply Agreement etc. have been signed.
- The Award of Honour from the National Safety Council (UK) have
been won by NTPC as a high performing organisation in the area of
Safety.
- NTPC organised special Family Welfare Camps in its
projects/stations, primarily for the benefit of nearby
population, where attractive monetary and non-monetary incentives
were offered by NTPC in addition to the incentive offered by the
State Govt.
- The NTPC Rehabilitation & Resettlement Policy was modified
with an objective to ensure that the project affected persons
improve or at least regain their existing standard of living at
the time of acquisition of land.
- The NTPC Pavilions at Ichchapur, in West
Bengal and Patna in Bihar, where energy conservation and
environment were the main themes, received the first and second
prizes respectively for best display.
- The employees of the company have got Prime
Minister's Shram Awards. This is the eighth consecutive year
that the company is getting the award. - NTPC has also bagged
the Company Standardization Award for 1992 from Institute of
Standards Engineers, an affiliated professional body of Bureau
of Indian Standards.
1994 - A tripartite agreement was signed
during the year between NTPC, UPSEB and GAIL for direct power
supply to GAIL.
- NTPC made a Public Issue of Bonds for Rs. 150 crores in December
'93 which was oversubscribed by more than four times.
- During the year 1993-94, Rihand STPP (2x500 MW) generation
was affected due to problem of vibration in the generation of
Unit-I necessitating it's shut down for 55 days resulting in
loss of generation of about 660 MUs.
- An agreement for financial assistance for Faridabad Combined
Cycle Gas Based Power Project (400 MW) has been singed with OECF,
Japan.
- NTPC and Oman Oil Company Ltd (OOC) have entered into a
Memorandum of Understanding (MOU) to promote a joint stock
public limited company with the intent of both parties along
with other associates to subscribe to equity to set up gas based
power projects under the latest guidelines issued by the Govt.
of India for private sector participation in power generation
and distribution.
- During the year, NTPC bagged the
prestigious "Jawaharlal Nehru Memorial National Award" for
effective implementation of Pollution Control Methods, among the
entire Indian Power Sector.
- MOUs have been signed with M/s. Nagarjuna
Litecrete Ltd. and M/s. Ria-Shelcon for setting up ash based
products manufacturing units with ash from Ramagundam and
Farakka Power Stations.
- NTPC's representative was a member of the
Task Force set up by Govt. of India for Standardisation of
various Bid Documents for the procurement of work, equipment &
services against World Bank financing.
- During the year the National Safety award
from the Government of India was conferred on Singrauli STPS
(Runners Up Award) and Farakka STPP (Consolation Award).
- British Safety Council has also awarded the prestigious National
Safety Award to six Projects of NTPC at Badarpur, Korba,
Ramagundam , BALCO, Anta and Kawas.
- NTPC became a member of the newly constituted Power Sports
Control Board during the year and successfully organised the
First Inter PSU Cricket Tournament at Singrauli, NTPC teams won
the team championships in Cricket, Volleyball, Hockey, Table
Tennis and Chess and were the runners up in Bridge.
- A news magazine "Vidyut Swar" in Hindi has been launched to
encourage the forum for budding talents.
2000 - Maharashtra State Electricity Board has signed
separate power purchase agreement with the company for the total
power supply of 1,345 mw from Kawas-II, Gandhar-II, Vindhyachal-II
and Siptat power stations.
- The capacity of the Company at Talcher in Orissa is expanding
from 1,000 mw to 2,000 mw.
- The Company has signed a memorandum of understanding with
the Ministry of Power for generating 9,4000 million units of
electricity during the current financial year.
- The Company is likely to be the joint venture partner of
newly-formed SAIL Power Supply Company Ltd, a wholly-owned
subsidiary of Steel Authority of India Ltd.
- The Company will sign a joint venture agreement to pick up 26 per
cent stake in the Gujarat Pipapav Liquefied Natural Gas Ltd's
Rs 2,500 crore LNG terminal.
- The Company has proposed to pick up a majority stake in Nathpa
Jakhri Power Corporation following shortfall in equity
contribution by the centre and the state government for the 1500
mw hydel project in Himachal Pradesh.
- The Company is getting into wind power segment, starting
preliminary work on two projects in Karnataka and Tamil Nadu each
with a capacity of 20 MW.
- NTPC will set up a Rs 8,000-crore LNG fuelled power plant in
Mangalore.
- The Company has established a 2000MW gas-based power plant near
Mangalore.
- The Company will double its generation capacity in the southern
region to 6,900 mw by the end of the Tenth Plan.
- The Company is switching over to higher capacity plant size of
660 MW and new generation power plant technology by adopting
supercritical parameters.
- Shhri Raghavan Pillai Parameswaran Nair of Korba Station of the Company
is the only recepient of the Shram Ratna Award. This is the second consecutive
year that NTPC has won the Shram Ratna award.
- The Company has signed an agreement with State Bank of
Patiala to raise a long-term loan of Rs 150 crores for
part-financing its ongoing power generation capacity expansion
programme.
- The Company have bagged the `British Safety
Council Awards' for the year 1999 in recognition and
commendation of services rendered for the cause of safety in the
projects. The award winning stations are Ramagundam, Farakka,
Rihand, Vindhyachal, Unchahar, Dadri, Talcher Kaniha, Talcher
Thermal, Anta, Jhanor Gandhar and NTPC-managed Badarpur Station.
- Mr. C.P. Jain has taken over as Chairman
and Managing Director of the Company.
- State-owned National Thermal Power
Corporation has agreed to pick up a minority 10 per cent stake
in Coal India Ltd's proposed venture in Bihar to supply coal to
the thermal power giant's four greenfield power projects in the
state.
- NTPC and ONGC are forming a new joint venture company for setting up gas residue-based
power projects.
- Moody's Investors Services has assigned a `BA2' long-term foreign currency issuer
rating to the company.
- The Company has launched a drive to recover arrears from
the electricity boards of Maharashtra, Madhya Pradesh, Gujarat,
Goa, Daman and Diu and Dadra Nagarhaveli.
- The Company has developed a unique
financial tool to ensure payment of the past dues.
- The state-run National Thermal Power
Corporation has offered to set up a coal-based power project in
Maharashtra.
2001 - The Workers of the Company observed a
one-day strike, the strike call has been given by the Centre of
India Trade Union.
- The Company has signed a memorandum of
understanding with the government to generate 1,21,000 million
units of electricity during 2001-2002.
- The indian Oil Corporation and National
Thermal Power Corporation have signed a memorandum of
understanding to set up petro-fuel power plants in India.
- :The National Thermal Power Corporation (NTPC)
has informed the government that it is not interested in taking
over the Enron-promoted Dabhol Power Project.
-The National Thermal Power Corporation (NTPC)
is planning to install new power plants in its western region,
which could be of 1000 mw or more.
2003
-'Best Employer' survey conducted by Business
Today and Hewitt Associates rates National Thermal Power
Corporation (NTPC) as the best employer among publlic sector
undertakings for 2002-03
-Receives Rs 11,503 crore bonds from State
Electricity Boards (SEB) towards dues
- Inked Rs 7,000-cr Loan agreement with LIC.
-NTPC Ramagundam unit has received the
Rajbhasha Award for 2002-03. In spite of its presence in a
non-Hindi speaking area, the company has bagged the award for
eight times.
-Inks power purchase agreement with
Mahrashtra State Electricity Board (MSEB)
2004
-NTPC join hands with Kerala State Industrial
Development Corporation (KSIDC) for setting up LNG terminal
- The Kerala State Industrial Development
Corporation (KSIDC) join hands with NTPC for Kayamkulam project
-NTPC inks pact for expansion of Kayamkulam
thermal plant
-Vajpayee dedicates NTPC power project to
nation
-Prime Minister unveils Simhadri project
-Shyam Benegal's film for NTPC adjudged as
best film on corporate responsibility
-NTPC and others join hands for Pipavav
project
-NTPC signs accord with ASCI for joint
research
-NTPC has signed a memorandum of
understanding (MoU) with Administrative Staff College of India (ASCI)
for carrying out joint research and prepare well-documented
policy options that would contribute to reform and sectoral
growth in the area of generation, transmission and distribution
of power.
-National Thermal Power Corporation,
Kayamkulam, gets award for industrial safety instituted by
National Safety Council, Kerala Chapter, in other industries
category
-Entered into an agreement with Indian
Institute of Technology, Mumbai, to promote research and
development in several areas including power distribution and
renewable technology.
-The 1000-MW Simhadri thermal power plant of
the NTPC here has got the ISO-9001 certification for quality
management, ISO-14001 for environment management and OHSAS -
18001 for safety management.
- NTPC expands installed capacity to 22,250
MW
-National Thermal Power Corporation Ltd. (NTPC)
has bagged the Enterprise Excellence Award
-The National Thermal Power Corporation (NTPC)
has signed an agreement with Uttaranchal government to develop
two hydro-electric projects with an installed capacity of 1120
mw in the hill state
-NTPC floats JV with TNEB for 1,000 MW power
project in Ennore
2005
-NTPC forges alliance with IOC for new power
plant
-NTPC CMD wins SCOPE award
-NTPC may ink agreement with RIL for gas
supply
- NTPC Hydro signs agreement to implement
Hydro-Electric Power Project
-NTPC Hydro signs agreement with WBSEB for
90mw unit
- Bharat Heavy Electricals (BHEL) teams up
with National Thermal Power Corporation (NTPC) for promoting a
100 mw IGCC (integrated gassification and combined cycle) power
project.
- NTPC signs MoU with Defence Metallurgical
Research Laboratory (DMRL) to develop gas turbine blades
2006
- NTPC appoints Mr R. Venkateswaran as
General Manager
-NTPC to set up 500MW plant in Sri Lanka
2007
-National Thermal Power Corporation Ltd (NTPC)
has informed that Shri. K B Dubey has taken over as Director
(Projects) of the Company w.e.f. January 12, 2007.
-National Thermal Power Corporation Ltd (NTPC)
has forayed into an pact with Coal India Ltd (CIL) to build and
run coal blocks and integrated coal based power plants.
-NTPC Ltd has inked a memorandum of
understanding (MoU) with the Ministry of Power. -NTPC signs
$100mn loan agreement with KfW
-NTPC Ltd and Singareni Collieries Company
Ltd (SCCL) on May 11, forayed into an equal joint venture for
development, operation and maintenance of coal blocks.
-NTPC Ltd on May 23,2007 inked an agreement
with Chhattisgarh State Electricity Board to sell electricity
from its Barh Super Thermal Power Station (stage II).
- Ntpc Limited has has appointed Shri Rajesh
Verma, Joint Secretary and Financial Advisor, Ministry of Power
as Part-time Director (Government nominee) on the Board of NTPC
Limited.
-National Thermal Power Corporation Ltd (NTPC)
has informed that a Memorandum of Understanding (MOU) has been
signed on July 29, 2007 between the Company and Anna University,
Chennai (AUC) to provide a platform for knowledge sharing and
collaboration to promote Research and Development.
-Ntpc Limited has informed that As per order
No. 8/6/2007 - TH. I dated 30th August , 2007 of the Ministry of
Power, Government of India and in pursuance of Article 41 of the
Articles of Association of NTPC Limited, the President has
appointed Shri V.P. Joy, Joint Secretary, Ministry of Power as
Part- time Director (Government nominee) on the Board of NTPC
Limited, with effect from August 30, 2007.
-National Thermal Power Corporation Ltd (NTPC)
has has signed a Memorandum of Understanding (MOU) with Bharat
Heavy Electricals Ltd (BHEL) for forming a Joint Venture Company
for carrying out Engineering Procurement and Construction (EPC)
activities in the power sector on mutually beneficial terms.
2008
-National Thermal Power Corporation Ltd (NTPC)
has informed that an MOU has been signed on February 08, 2008
between the Company and Bharat Forge Ltd (BFL) to promote a
Joint Venture Company, with an equity participation of 49:51 by
the Company and BFL respectively, to take up manufacture of
castings, forgings, fittings and High Pressure piping required
for Power and other industries, Balance of Plant (BOP) equipment
for the power sector etc.
- National Thermal Power Corporation Ltd (NTPC)
has informed that as per order dated December 26, 2008 of
Ministry of Power, Government of India and in pursuance to
Article 41 of the Articles of Association of NTPC Ltd, the
President of India has appointed Shri I J Kapoor, as Director
(Commercial) on the Board of Directors of NTPC for a period of
five years with effect from the date of taking over the charge
of the post or till date of his superannuation or until, further
orders whichever event occurs the earliest. |